Post by uzairjubilee on Apr 23, 2017 11:01:40 GMT
|
|
|
Post by Dstock7080 on Apr 27, 2017 5:28:33 GMT
Just to clarify, the only crossover to go will be the one between platforms 2/3 (points 17/19) ? That's correct, other points in the immediate area (12A/B 30A/B) will be smoothed to ease curvature.
|
|
|
Post by harbour on May 5, 2017 18:02:53 GMT
I finally was on a train that arrived into platform 1 at Earls Court from Wimbledon this morning (train 124), after several announcements of congestion ahead. I was really surprised when I looked out of the window to the left of the train and saw the wall rather than a platform! Disappointingly my wife tells me she has similarly arrived into P1 a few weeks back. Perhaps it is now a move that is now becoming used more when problems with the service are occurring?
|
|
Deleted
Deleted Member
Posts: 0
|
Post by Deleted on May 5, 2017 18:52:48 GMT
It can be worked anytime if the signaller wishes
|
|
|
Post by Dstock7080 on May 6, 2017 5:55:25 GMT
I finally was on a train that arrived into platform 1 at Earls Court from Wimbledon this morning (train 124) Coincidentally T125 was also worked into pfm.1, running around a Tower Hill service in pfm.2
|
|
rincew1nd
Administrator
Junior Under-wizzard of quiz
Posts: 10,286
|
Post by rincew1nd on May 7, 2017 11:22:05 GMT
Train 755 (D Stock tour) today used the crossover. Possibly the first and probably the last time one will do so whilst carrying passengers.
|
|
Tom
Administrator
Signalfel?
Posts: 4,196
|
Post by Tom on May 14, 2017 21:36:03 GMT
Just to clarify, the only crossover to go will be the one between platforms 2/3 (points 17/19) ? That's correct, other points in the immediate area (12A/B 30A/B) will be smoothed to ease curvature. No. 17 crossover will be renewed, not removed. The alterations is that the 'B' end, which is currently a single switch working in wide-to-gauge configuration with No. 19 points (trapping a reversing train) will be modified to become a standard crossover. No. 19 points will be decommissioned, requiring a mechanical interlocking modification. I can see how I'll be spending Boxing Day Night!
|
|
Deleted
Deleted Member
Posts: 0
|
Post by Deleted on May 15, 2017 8:25:39 GMT
More lovely Surelocks I take it with 8's being done in July
|
|
|
Post by roman80 on Jul 26, 2017 21:41:34 GMT
I see another long close down this Christmas for the district line west of South Kensington (December 25 to 30). Is there more major work planned at Earls Court? Or is another area the main focus?
|
|
Deleted
Deleted Member
Posts: 0
|
Post by Deleted on Jul 26, 2017 22:47:16 GMT
East end of Earl's Court having more point conversions and another junction installed
|
|
|
Post by scheduler on Sept 2, 2017 3:55:53 GMT
I hope trains will still be able to arrive eastbound into platform 2, detrain, shunt forward and reverse back into platform 3. If not that could be a disaster. That move is used in the normal working timetable several times and I've just put in several more of them for the engineering works on first weekend in February.
|
|
|
Post by Dstock7080 on Sept 2, 2017 4:14:18 GMT
I hope trains will still be able to arrive eastbound into platform 2, detrain, shunt forward and reverse back into platform 3. At Earl's Court, they will.
|
|
Tom
Administrator
Signalfel?
Posts: 4,196
|
Post by Tom on Sept 3, 2017 12:00:02 GMT
Ah. That was my backup plan if things don't go well...!
|
|
Deleted
Deleted Member
Posts: 0
|
Post by Deleted on Sept 3, 2017 19:30:53 GMT
what again
|
|