|
Post by sarah607 on Jan 10, 2009 18:03:57 GMT
hi does any one have any info on where the tracks are going to on the west London side of the route? any way Ealing Broadway and Southall with have to be totally knocked down and make a whole new layout.
|
|
|
Post by amershamsi on Jan 10, 2009 18:21:24 GMT
no new GWML tracks would be built. There's a portal at Royal Oak, and that's about it.
There will be new reversing sidings at Maidenhead, but that's it West of Acton Main Line.
|
|
Ben
fotopic... whats that?
Posts: 4,282
|
Post by Ben on Jan 10, 2009 20:20:54 GMT
Indeed. Slightly off the topic, but there was once a Crossrail plan that included 6-tracking this section. It died.
|
|
|
Post by cetacean on Jan 11, 2009 0:53:46 GMT
|
|
|
Post by sarah607 on Jan 11, 2009 9:56:40 GMT
thanks
|
|
Deleted
Deleted Member
Posts: 0
|
Post by Deleted on Jan 11, 2009 11:30:49 GMT
But they are knocking down Ealing Broadway station and rebuilding tho aren't they?
|
|
|
Post by sarah607 on Jan 11, 2009 12:21:04 GMT
i think there were going knock that down are make a big interchange for the buses and trains (bus station aswell).
|
|
|
Post by cetacean on Jan 11, 2009 12:52:20 GMT
Ealing Broadway gets a new entrance building/concourse over the mainline (ie slightly further south than the existing one, which will close), and a new footbridge with lifts.
(which is true of several stations, and just about all of them get platform extensions to handle 10 car trains)
|
|
|
Post by Dstock7080 on Jan 11, 2009 14:16:19 GMT
|
|