|
Post by glasgowdriver on Dec 23, 2008 17:57:47 GMT
just had a look at the jubilee line engineering works for the 6months ahead on tfl website. Noticed in Feb there is allot of engineering work and services are closed between London bridge - stanmore will be a nightmare reversing at London bridge i would imagine. Would it not be easier for them to just close the whole line rather than have it running between London bridge and Stratford
|
|
towerman
My status is now now widower
Posts: 2,968
|
Post by towerman on Dec 23, 2008 19:35:18 GMT
Shouldn't be too much of a problem,they'll probably do the same as when there's Waterloo rervesing,Another driver jumps in the back cab at London Bridge and takes it straight back over the crossing,the driver that is now at the back gets off at London Bridge EB walks across to the WB platform and gets in the back of the next train in and so on.
|
|
Deleted
Deleted Member
Posts: 0
|
Post by Deleted on Dec 23, 2008 20:16:05 GMT
Didn't we have a barrage of recent closures where we had shuttles at both ends of the line?
|
|
|
Post by glasgowdriver on Dec 23, 2008 20:39:35 GMT
mmmmm you may be right ATO i remember a shuttle between ngw - sfd and w/pk - smr
so in otherwords they will b stepping back at ll/bridge
|
|