|
Post by superteacher on Aug 16, 2008 22:33:34 GMT
Where will the new LO platforms be? What will they be numbered as?
|
|
Chris M
Global Moderator
Forum Quizmaster
Always happy to receive quiz ideas and pictures by email or PM
Posts: 19,762
Member is Online
|
Post by Chris M on Aug 16, 2008 23:51:06 GMT
See this post on the old London Connections blog for an annotated air photo showing where the platforms will be. I don't recall seeing anything about what they'll be numbered but the entire station could do with the platforms being renumbered.
|
|
Deleted
Deleted Member
Posts: 0
|
Post by Deleted on Aug 17, 2008 10:32:22 GMT
It is envisaged that the existing double junction at Channelsea will be modified to provide a parallel double track. Running round to the end of platform 12 and terminating in a single island terminus.
The numbering is expected to be 1 & 2 as the DLR platforms for the services to International station will be renumbered in line with the current Jubilee numbering.
|
|
|
Post by astock5000 on Aug 17, 2008 16:07:30 GMT
When will the new platforms open?
|
|
Deleted
Deleted Member
Posts: 0
|
Post by Deleted on Aug 17, 2008 16:22:17 GMT
January
|
|
Deleted
Deleted Member
Posts: 0
|
Post by Deleted on Aug 17, 2008 16:55:27 GMT
When did it get put back?
The bridge over the track has Westfields logo in red (on a blue bridge).
|
|
Deleted
Deleted Member
Posts: 0
|
Post by Deleted on Aug 17, 2008 18:34:51 GMT
It might be open earlier, but that is the date I have been told that the old low level platforms will close.
|
|