|
Post by richie on May 16, 2008 12:38:34 GMT
The New Cross Gate flyover for London Overground went in last weekend, with no hitches. The 75m long steel truss bridge with a total weight of around 1200 tonnes (including the concrete deck and steelwork) spans four mainline tracks and will carry the East London line towards London. Due to heavy load, the space available and nature of the site, using a crane was not practical so the bridge was moved using self-propelled mobile transporters. These are multi-wheeled units that spread heavy loads between numerous axles and roll structures into place. Cheers....
|
|
Deleted
Deleted Member
Posts: 0
|
Post by Deleted on May 16, 2008 16:01:30 GMT
Pics are not visible, unfortunately...
|
|
Colin
Advisor
My preserved fire engine!
Posts: 11,346
|
Post by Colin on May 16, 2008 17:48:37 GMT
The reason the pics are not visible is that they are on the internal TfL source site.
I will leave things as is, assuming you'll be able to see these on a TfL computer (and if you have access to an TfL computer, naturally you'll have the right to view these images).
**Admin hat on** Can I suggest that in future, any images that are on an internal TfL website are to be considered in the same vein as any other official documents (ie, we'd rather they weren't posted here in the first place). **Admin hat off**
|
|
Deleted
Deleted Member
Posts: 0
|
Post by Deleted on May 16, 2008 20:54:00 GMT
|
|
|
Post by richie on May 19, 2008 7:59:30 GMT
okay no worries, I'll remember that
cheers
|
|