|
Post by Dstock7080 on Sept 4, 2024 8:53:36 GMT
In connection with 4LM SMA9 system testing works, Preston Road-Moor Park/West Harrow, Metropolitan Line services will be completely suspended on Saturday 28 and Sunday 29 September 2024 Piccadilly Line, suspended South Harrow-Uxbridge Chiltern Railways suspended Aylesbury/Aylesbury Vale Parkway-Marylebone via Amersham.
|
|
|
Post by imran on Sept 4, 2024 17:22:48 GMT
When was the last time the entire Metropolitan Line was closed for the weekend for engineering works?
|
|
|
Post by jimbo on Sept 4, 2024 17:36:26 GMT
Presume that is for reversal of test trains outside the new signalling area. Maybe will also apply to future testing of the remaining SMA areas?
|
|
Tom
Administrator
Signalfel?
Posts: 4,196
|
Post by Tom on Sept 4, 2024 19:30:22 GMT
Probably only a SMA9 issue - for SMAs 13 and 14 I would envisage a reduced service but not a complete suspension.
|
|
gefw
Gone - but still interested
Posts: 201
|
Post by gefw on Sept 5, 2024 8:47:09 GMT
Probably only a SMA9 issue - for SMAs 13 and 14 I would envisage a reduced service but not a complete suspension. Any idea yet of the number of closures for SMA9 testing are planned (assuming all goes perfectly) ? I see the next SMA8 test weekend is in Oct , but at least one other planned for the changeover in 2025?
|
|
|
Post by Dstock7080 on Sept 5, 2024 9:43:19 GMT
No more planned closures for SMA9 testing before commissioning early-2025.
|
|