Post by xtmw on Jun 13, 2022 9:35:34 GMT
Bakerloo Line services from Elephant and Castle - Lambeth North have been suspended due to a fire. Apparently damage to signalling equipment.
Update: Apparently an overheated insulator pot.
|
|
|
Post by Chris L on Jun 13, 2022 13:19:25 GMT
Apparently damage to signalling equipment. What's going on here then. Easy to find out on the TfL website. Bakerloo Line: No service between Elephant and Castle and Lambeth North due to emergency engineering work to fix damaged signalling equipment at Elephant and Castle. MINOR DELAYS on the rest of the line. Valid tickets are being accepted on London buses.
|
|
|
Post by programmes1 on Jun 13, 2022 14:47:36 GMT
Apparently damage to signalling equipment. What's going on here then. Easy to find out on the TfL website. Bakerloo Line: No service between Elephant and Castle and Lambeth North due to emergency engineering work to fix damaged signalling equipment at Elephant and Castle. MINOR DELAYS on the rest of the line. Valid tickets are being accepted on London buses. Chris, That is what the OP put damaged signalling equipment as the service has been suspended since the start of the day it must have been done in what they call engineering hours but going by how long it's taking must be either significant or a part they don't have a lot of spares. I'm sure one of our LU members will come along when they can.
|
|
|
Post by Dstock7080 on Jun 13, 2022 14:56:10 GMT
First signs of problems at 20.56 yesterday when track circuits started failing and then traction current tripped out at 22.10. Services suspended. Fire brigade called and dispatched. Damage to section switches which contain asbestos elements. Flooding in sidings area from external leak. (not clear which came first, leak causing shorting, or lack of power)
Services still suspended Tue 14 June AM.
|
|
|
Post by xtmw on Jun 13, 2022 15:31:32 GMT
Along with this no District line South Ken - Earls Court due to emergency engineering works. On and off all day
|
|
|
Post by Chris L on Jun 13, 2022 17:38:03 GMT
Easy to find out on the TfL website. Bakerloo Line: No service between Elephant and Castle and Lambeth North due to emergency engineering work to fix damaged signalling equipment at Elephant and Castle. MINOR DELAYS on the rest of the line. Valid tickets are being accepted on London buses. Chris, That is what the OP put damaged signalling equipment as the service has been suspended since the start of the day it must have been done in what they call engineering hours but going by how long it's taking must be either significant or a part they don't have a lot of spares. I'm sure one of our LU members will come along when they can. I amplified the original post. Emergency engineering work.
|
|
|
Post by programmes1 on Jun 14, 2022 5:11:15 GMT
Chris, That is what the OP put damaged signalling equipment as the service has been suspended since the start of the day it must have been done in what they call engineering hours but going by how long it's taking must be either significant or a part they don't have a lot of spares. I'm sure one of our LU members will come along when they can. I amplified the original post. Emergency engineering work. Chris, All you did was put Emergency engineering work I don't call that amplified, now if you had given some reasons or even put the reason if you knew what it was to have the service suspended for so long then I could agree but you brought nothing to the table so to speak. Anyway have a good one
|
|
class411
Operations: Normal
Posts: 2,747
|
Post by class411 on Jun 14, 2022 7:31:39 GMT
If trains are suspended because of a fire, after an hour or so it's obvious that there are emergency engineering works.
I expect that when the fire started, some trains were held at red signals, with automated messages telling passengers that they should be moving shortly.
|
|
DWS
every second count's
Posts: 2,487
|
Post by DWS on Jun 14, 2022 13:59:17 GMT
Service still suspended between Lambeth North and Elephant & Castle on Tuesday 14 June 2022 any one know why this is taking time to fix ?
|
|
Chris M
Global Moderator
Forum Quizmaster
Always happy to receive quiz ideas and pictures by email or PM
Posts: 19,781
|
Post by Chris M on Jun 14, 2022 15:32:45 GMT
Service still suspended between Lambeth North and Elephant & Castle on Tuesday 14 June 2022 any one know why this is taking time to fix ? [the damage] must be either significant or a part they don't have a lot of spares.
|
|
|
Post by t697 on Jun 14, 2022 18:33:08 GMT
If trains are suspended because of a fire, after an hour or so it's obvious that there are emergency engineering works. I expect that when the fire started, some trains were held at red signals, with automated messages telling passengers that they should be moving shortly. On the Bakerloo 72TS trains' present very limited CIS I don't think that particular message is available, perhaps fortunately...
|
|
|
Post by xtmw on Jun 15, 2022 8:05:53 GMT
A service to Elephant & Castle has resumed but with severe delays on the line.
|
|
|
Post by Dstock7080 on Jun 15, 2022 10:14:10 GMT
A service to Elephant & Castle has resumed but with severe delays on the line. Resumed with train 221 N3557+3243S at 07.34 arrival, 07.39 departure
|
|
|
Post by Tubeboy on Jun 15, 2022 23:45:09 GMT
Sidings are still out of commission however.
|
|