Does anybody know why they replaced a large stretch of ballast at Barking Platform 2 over a few weekends starting sometime in July, to then replace the whole section entirely this weekend? Nearly the entire lengths ballast had been replaced from what I remember seeing last week, it seemed a bit of an odd thing as the section of track was looking a bit tired. These links to the District Line twitter feed show them replacing the ballast (By what looks like a giant vaccum cleaner) Big VacuumRemoving Ballast
This weekend them replacing the whole lot with track panels All replaced Track Panels
|
|
rincew1nd
Administrator
Junior Under-wizzard of quiz
Posts: 10,286
|
Post by rincew1nd on Dec 6, 2015 20:25:37 GMT
Perhaps the first job revealed things were not as expected, hence the bigger replacement job?
|
|
Deleted
Deleted Member
Posts: 0
|
Post by Deleted on Dec 7, 2015 16:46:07 GMT
Or it could be due to the point replacement of the set that takes a train into the sidings next year as they only work on flat bottom rail.
|
|