Jan 2014, 5 weeks worth of engineering work at Uxbridge Nov 23, 2013 18:56:57 GMT Select PostDeselect PostLink to PostMemberGive GiftBack to Top Post by Deleted on Nov 23, 2013 18:56:57 GMT HiJust had a look at the future engineering work:www.tfl.gov.uk/livetravelnews/planned-works/calendar/default.aspxThere is going to be five continuous weekends, where the Uxbridge branch will always be closed another with other sections of the line.What work is going on?RegardsSimon
Jan 2014, 5 weeks worth of engineering work at Uxbridge Nov 23, 2013 19:14:44 GMT Select PostDeselect PostLink to PostMemberGive GiftBack to Top Post by Deleted on Nov 23, 2013 19:14:44 GMT Nov 23, 2013 18:56:57 GMT @simon11 said:HiJust had a look at the future engineering work:www.tfl.gov.uk/livetravelnews/planned-works/calendar/default.aspxThere is going to be five continuous weekends, where the Uxbridge branch will always be closed another with other sections of the line.What work is going on?RegardsSimon-Track Replacement -Drainage-Replacing Points and Crossings