Post by neilw on Oct 19, 2007 12:46:23 GMT
Hi everyone. I am building a model of the Eastern end of the Central, at a fictitious location where the tube takes over a former GER line. The present day (1970's) terminus was originally going to be a through station, and the sidings were a short term measure using a shunting neck on the former GER trackbed. However, the final part of the New Works extension never happened, leaving the present day layout. I have taken the track layout from a mixture of termini.
Some help from the experts on the board would be appreciated, particularly regarding signalling. I have put a schematic at
www.geocities.com/n.white3@btinternet.com/signalling (sorry, you will have to put the last bit in your browser, spent hours trying to get a hyperlink to work!). My questions are
*Is signal BC1 correct, in that if showing the extreme "hard right" on the harbour lights (sic?), the route would actually be straight on first then taking the last set of RH points if a conflicting move from plt 3 was to be avoided?
*Would BC 2 and 3 both be on the platform end to enable sighting by the Guard?
*The shunt signals allow for a double shuffle of a train in plt 1 to gain the sidings, would there be anything on either running line to mark/ protect a shunt limit?
*I think I need trap points as shown, one to protect the siding exit, the other to protect the exit to plt 3 (like Hainault) but I'm not 100% sure.could someone enlighten me please?
*Any other comments/advice would be very welcome
cheers
Admin comment: the reason your link won't work properly is that the forum won't recognise the symbol '@' within a URL - it thinks it's an email address!
Colin.
Some help from the experts on the board would be appreciated, particularly regarding signalling. I have put a schematic at
www.geocities.com/n.white3@btinternet.com/signalling (sorry, you will have to put the last bit in your browser, spent hours trying to get a hyperlink to work!). My questions are
*Is signal BC1 correct, in that if showing the extreme "hard right" on the harbour lights (sic?), the route would actually be straight on first then taking the last set of RH points if a conflicting move from plt 3 was to be avoided?
*Would BC 2 and 3 both be on the platform end to enable sighting by the Guard?
*The shunt signals allow for a double shuffle of a train in plt 1 to gain the sidings, would there be anything on either running line to mark/ protect a shunt limit?
*I think I need trap points as shown, one to protect the siding exit, the other to protect the exit to plt 3 (like Hainault) but I'm not 100% sure.could someone enlighten me please?
*Any other comments/advice would be very welcome
cheers
Admin comment: the reason your link won't work properly is that the forum won't recognise the symbol '@' within a URL - it thinks it's an email address!
Colin.