Hi
Out today noted a Class 66 in Harrow on the hill as part of the track renewal.....
Seem like that been going on forever, does anyone know when it due to be completed... ie no more line closer every other weekend....
Thanks
|
|
Deleted
Deleted Member
Posts: 0
|
Post by Deleted on Nov 18, 2012 14:59:05 GMT
Where is the BTR this weekend.? Looking at the amount of ballast spoil its a big one
|
|
Deleted
Deleted Member
Posts: 0
|
Post by Deleted on Nov 18, 2012 18:58:32 GMT
Southbound local between Northwick Park and Preston Road.
Four GB trains involved.
Same closure (Wembley Park to Northwood and Rayners Lane) next weekend according to the TfL list.
Reported as five GB trains involved.
Andy
|
|
Deleted
Deleted Member
Posts: 0
|
Post by Deleted on Nov 20, 2012 7:53:19 GMT
LU provided one train and a tamper last week, GB provided 4 trains. This weekend the same closure is in place and 5 GB trains are booked into the site, the extra train being the Slinger set from Tonbridge. LU will be providing a train and a tamper as always
|
|
Deleted
Deleted Member
Posts: 0
|
Post by Deleted on Nov 25, 2012 12:35:16 GMT
Pass the working again today for this weekend closer.
how often do they do a loco change as part of the operation.
Ballast train coming out of Harrow on the Hill Station
Loco Swap on Ballast train ( 3 parts)
|
|
Deleted
Deleted Member
Posts: 0
|
Post by Deleted on Nov 25, 2012 12:43:07 GMT
There is a class 66 parked just east of Rayners Lane attached, I think, to something. Couldn't quite see what earlier.
|
|
Deleted
Deleted Member
Posts: 0
|
Post by Deleted on Nov 25, 2012 14:40:24 GMT
It's connected to several wagons containing ballast. Was in the area from early Saturday morning (first seen about 5am) & today parked on the westbound line.
|
|
Deleted
Deleted Member
Posts: 0
|
Post by Deleted on Nov 25, 2012 15:52:00 GMT
Sunday morning's the Ricky drivers get to pilot the 66's on the water train in and out of Ricky south sidings.
|
|
Deleted
Deleted Member
Posts: 0
|
Post by Deleted on Dec 2, 2012 19:19:21 GMT
This weekend the same closure is in place and 5 GB trains are booked into the site, the extra train being the Slinger set from Tonbridge. No sign of a 'slinger set' or RSDT (Rail and Sleeper Delivery Train) in the five GB trains I observed last weekend. From a posting on se-gen and Mk1 eyeball on site the train from Tonbridge was 66708 t&t 66738 + 23 MLA. harrowrail asked 'how often do they do a loco change as part of the operation.' Fairly often. Last week there were five trains (ten ends) and nine locos in use. They have to be top and tailed to reverse at Neasden South Jn (among other places). Once one of the early incoming trains has arrived at Harrow one of the locos will drop off and work light engine to meet up with a later working. A similar arrangement takes place on the way out. The eastbound line between West Harrow and short of Harrow on the Hill was relaid last weekend. Andy
|
|