Post by d7666 on Nov 21, 2011 16:17:51 GMT
The transformers were craned into place to a high level about equal to a 2nd floor if it were an office building some time between late mid-week last week and this morning. As seen from 3rd/4th floors of GriffithsHouse, there was just empty space there last week. 2 large road cranes have been on site for about 10 days now, previously there was only 1. Other possibly smaller (a relative term they are still huge) transformers installed on the ground floor i.e. road level about 6-8 weeks ago.
-- D7666
|
|