Dstock7080
Administrator
Posts: 5,805
Member is Online
|
Post by Dstock7080 on Nov 14, 2009 13:01:48 GMT
I see there's an odd engineering suspension this weekend: "Saturday 14 and Sunday 15 November, suspended between Stanmore and Waterloo and between North Greenwich and Stratford". Guess not many trains required for Waterloo-North Greenwich? are these ones stabled in the platforms at North Greenwich?
|
|
towerman
My status is now now widower
Posts: 2,969
|
Post by towerman on Nov 14, 2009 17:49:36 GMT
Requires 6 trains in service + 1 spare,stabled overnight at various locations between North Greenwich & Waterloo.BTW as a "heads up"the entire line is now closed on 21st November,still Waterloo-Stratford shuttle on 22nd.
|
|
|
Post by citysig on Nov 14, 2009 18:22:07 GMT
At least this weekend, due to popular demand (and maybe someone reading certain threads on this forum) the Met is stopping additionally at Willesden Green.
Neasden may happen in the future, but because this was a short-notice decision, the timetable for the Met is for the normal stopping patterns. To stop at Willesden means many trains will be slightly delayed - and this can be stomached. To stop at Neasden as well without a proper timetable, the late-running and congestion would have built up very quickly.
|
|
towerman
My status is now now widower
Posts: 2,969
|
Post by towerman on Nov 18, 2009 19:02:44 GMT
Have now been advised that the shuttle on Sunday has been cut back to North Greenwich-Waterloo.
|
|