Deleted
Deleted Member
Posts: 0
|
Post by Deleted on Feb 14, 2009 10:32:34 GMT
The service was suspended between London Bridge and Green Park with servere delays on the rest of the line.
|
|
Deleted
Deleted Member
Posts: 0
|
Post by Deleted on Feb 14, 2009 12:16:39 GMT
H-m-m, and?
|
|
Deleted
Deleted Member
Posts: 0
|
Post by Deleted on Feb 14, 2009 12:57:47 GMT
I was caught on it. Reminded me of when the extension first opened and it was beset by these kind of failures every single day - sometimes more often.
|
|
|
Post by Tubeboy on Feb 14, 2009 13:15:04 GMT
A signal failure at Green Park usually causes alot of aggro, something to do with the interface between the "old" and "new" signalling on the Jubilee.
Another piece of good news, Tubelines installed the wrong cable on the dual fitted area between Kingsbury and Stanmore for the new signalling [Miles of it!] Now it has to be ripped up and replaced with the correct type.....so loads more weekend closures.
|
|
|
Post by upfast on Feb 14, 2009 15:24:18 GMT
A signal failure at Green Park usually causes alot of aggro, something to do with the interface between the "old" and "new" signalling on the Jubilee. Another piece of good news, Tubelines installed the wrong cable on the dual fitted area between Kingsbury and Stanmore for the new signalling [Miles of it!] Now it has to be ripped up and replaced with the correct type.....so loads more weekend closures. ;D ;D ;D ;D ;D ;D Was this the same sort of cable that they posted to every Jubilee staff member's house? And in some instances caused a security alert!
|
|
Deleted
Deleted Member
Posts: 0
|
Post by Deleted on Feb 14, 2009 15:59:41 GMT
Indeed it does and as a SE Londoner I well remember such problems, at least the DLR offers some alternative nowadays. I was caught on it. Reminded me of when the extension first opened and it was beset by these kind of failures every single day - sometimes more often.
|
|
|
Post by stanmorek on Feb 14, 2009 17:09:22 GMT
A signal failure at Green Park usually causes alot of aggro, something to do with the interface between the "old" and "new" signalling on the Jubilee. Another piece of good news, Tubelines installed the wrong cable on the dual fitted area between Kingsbury and Stanmore for the new signalling [Miles of it!] Now it has to be ripped up and replaced with the correct type.....so loads more weekend closures. ;D ;D ;D ;D ;D ;D Was this the same sort of cable that they posted to every Jubilee staff member's house? And in some instances caused a security alert! So will staff be asked to return these cables now?
|
|
Deleted
Deleted Member
Posts: 0
|
Post by Deleted on Apr 18, 2009 14:46:03 GMT
Yes, we heard some comments, at the O2 (AC/DC) concert over their PA. Everybody just laughed though and took it as the norm for our wonderful tube system. They put back the start of the support band apparently - I didn't bother with them.
|
|