The final workings of Class 319 units on Thameslink look set to run on Sunday 27th August. Units 319440/443 will work the following diagrams: 5G19, Bedford CS (07:05) to Bedford (07:08)2K19, Bedford (07:16) to St Albans (08:00)2G08, St Albans (08:10) to Bedford (08:53) 1W19, Bedford (09:06) to Brighton (11:52) 1W22, Brighton (12:14) to Bedford (14:57)2W51, Bedford (15:20) to Three Bridges (17:33)2W58, Three Bridges (17:55) to Bedford (20:09)5G58, Bedford (20:14) to Bedford CS (20:17)Units 319217/435 will work the following diagrams: 5G29, Bedford CS (09:32) to Bedford (09:35)2W29, Bedford (09:50) to Three Bridges (12:01)2W36, Three Bridges (12:24) to Bedford (14:38)1W43, Bedford (15:06) to Brighton (17:52)1W46, Brighton (18:14) to Bedford (20:59)5G47, Bedford (21:09) to Bedford CS (21:12)Units 319426/432 will be held at Caldwell as a spare in the event of a failure, it is the 319's after all.
|
|