Post by ianh100 on Sept 8, 2009 18:24:54 GMT
Hi guys,
just wondering if anyone can share any info.. im interested in the maintenance schedule for the trains, what checks / servicing they do frquencies etc , how long it takes, what happens in event of breakdown, how do they get it back to depot etc etc..
i run a small bus company and am a skilled psv engineer, hence my interest in this side of things,
many thanks
Ian
|
|
towerman
My status is now now widower
Posts: 2,883
|
Post by towerman on Sept 8, 2009 18:41:52 GMT
Can only speak for stock pre 1990s.Examination every 14 days,shed inspection every 36weeks,programme lift every 12-18 months,heavy overhaul every 7 years.
|
|
Deleted
Deleted Member
Posts: 0
|
Post by Deleted on Sept 8, 2009 18:43:27 GMT
just matter of interest what is involved in each exam
|
|
|
Post by ianh100 on Sept 8, 2009 18:51:33 GMT
whats involved in them all?? and how long do they take to do..??
|
|
Deleted
Deleted Member
Posts: 0
|
Post by Deleted on Sept 8, 2009 19:26:56 GMT
Every night all trains go a basic check of the Deadman, doors, brakes, tripcock and motors during prep and signed off by depot staff.
|
|
towerman
My status is now now widower
Posts: 2,883
|
Post by towerman on Sept 8, 2009 19:58:22 GMT
14 daily exam-worn brake blocks & pick up shoes replaced,pick up shoes & tripcocks gauged & adjusted as necessary,trucks & suspension checked for cracks,loose fittings & worn or leaking dampers,compessors topped up with oil as necessary,saloons & cabs checked for broken glass,damaged floors/seats,all missing seals replaced,brakes,doors,traction control & safety devices tested.On the Bakerloo one 7 car was a days work for one man. 36 weekly-same as 14 daily plus axles,motors & MAs lubricated,doors gapped,all 630v circuits plus door control circuit meggered for earth faults,batteries topped up or changed as necessary,wheels gauged for deep & thin flanges.One train done by a gang of men in a day. Programme lift-body lifted off trucks & trucks overhauled,wheels and suspension changed as necessary.Takes about a week. Heavy overhaul-basically a super programme lift,when this was done at Acton Works a practically new train came back.Takes 3-4 weeks.
|
|
|
Post by ianh100 on Sept 8, 2009 20:31:51 GMT
Thanks for that very informative, with that knowledge i assume your an engineer?? it sounds quite a programme!!
|
|
towerman
My status is now now widower
Posts: 2,883
|
Post by towerman on Sept 8, 2009 21:06:42 GMT
I used to be on fleet maintenance,now in the goldfish bowl on the east end of the Jubliee.
|
|
|
Post by ianh100 on Sept 8, 2009 21:17:48 GMT
goldfish bowl? sorry, im new lol!!!
|
|
towerman
My status is now now widower
Posts: 2,883
|
Post by towerman on Sept 8, 2009 21:50:32 GMT
The control tower in Stratford Market Depot.
|
|
Deleted
Deleted Member
Posts: 0
|
Post by Deleted on Sept 9, 2009 15:23:31 GMT
so i take it the heavy overhaul is done by the main depots now as acton basically don't exist there now
|
|
towerman
My status is now now widower
Posts: 2,883
|
Post by towerman on Sept 9, 2009 18:22:49 GMT
That's correct IMHO they don't do nowhere as good a job,but that costs money which is a no no these days.
|
|